Mid-winter Caravelle news from the writing desk

Sunnuntai 14.1.2024 - Erja Reinikainen

Suomeksi

About six months ago Ismo Matinlauri wrote a blog on this website where he talks about the amount of work and accessories used so far for Caravelle’s restoration project. At the end of 2023 the number of working hours spent on Caravelle’s disassembly, restoration and reassembly totalled 5,653 hours.

Cblogi2024-02-01.jpg

Photo via Ismo Matinlauri.

Paraphrasing Ismo’s text from last July: "Restoring the Caravelle has required a fair number of volunteers’ working hours. The job can’t be done by restoration work volunteers alone, a lot of paperwork is also needed".

Cblogi2024-02-02.jpg

Photo via Ismo Matinlauri.

The successful running of the project has required comprehensive commitment from the key personnel, especially for planning, procurement, and practical arrangements before each actual phase of work. In the three years since the beginning of the project, a large number of Caravelle-related meetings have been arranged by various groups involved in the project:

  • follow-up meetings of the Aviation Museum Society Finland board in the critical phases of the project
  • gatherings of the technical planning team, every other week in average
  • meetings for the transport planning
  • meetings for organizing competitions for equipment and service providers and procurement meetings during the disassembly phase and later in the reassembly phase
  • weekly meetings for work planning and material procurement during the restoration phase
  • furthermore, several unofficial ad-hoc work sessions have been arranged, especially by the technical crew.

A memo has been written of nearly all meetings. We can say that the project has been rather well documented for the future aviation history researchers.

The background crew of the project have also taken care of informing the various stakeholders about the project, as well as of Facebook posting, press releases, media interviews, photo processing, project material filing, etc. My estimate is that there are about 8-10 of us who have been involved in the project as PR officers, writers, translators, bloggers, photographers, etc.

Cblogi2024-02-03.jpg

Photo by Erja Reinikainen.

About 50 blogs have been written yearly on the Caravelle project website, and all blogs have been complemented with photographs and translated into English. The web pages went through a thorough update in October 2023. Several articles have been written about the Caravelle and the project phases, mainly for the Feeniks journal of the Aviation Museum Society, but also for other aviation history magazines.  

Based on an unofficial and rather freely formulated Excel spreadsheet, about 70 meeting memos have been prepared so far in the Caravelle project. About 80 person-workdays have been spent in meetings when all participants and the memo writing are considered. It can be also estimated that about 40 person-workdays have been spent on publishing all the blogs, including writing, translation, photographs, and publishing.

As the year 2024 progresses and the Caravelle restoration work continues, there will be more weekly meetings, blogs, articles, and photographs – and the documenting team will be busy again…

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Repairing the Caravelle right-hand wingtip

Sunnuntai 14.1.2024 - Tuesday Club member

Suomeksi

Acquired from Sweden by Aviation Museum Society Finland, the Caravelle (OH-LEA) restored at Turku airport as Finnair’s “Bluebird” had had its right-hand wingtip leading edge badly damaged during its stay in Sweden. It was damaged for a distance of ca. 40 cm, and at the process the wingtip navigation light was also destroyed. Luckily the left-hand wingtip is intact, so that it can be used as a model when rebuilding the right-hand smashed wingtip. So the destroyed wingtip must be remade.

Blogi_2024-01-01-02.jpg

The remaking the right-hand wingtip was started by dismantling the damaged area. The rivets on the crumpled aluminium sheets were drilled away, so that the wingtip covering could be bent open, and the covering sheets detached from the wingtip support frame. We tried to straighten the detached aluminium sheets to their original shape, but they turned out to be so brittle, that they broke when straightened to their shape. So we concluded that the right-hand wingtip leading edge had to be covered with new sheets of aluminium.

Blogi_2024-01-03.jpg

Blogi_2024-01-04-05.jpg

Blogi_2024-01-06-07.jpg

We dismantled the detachable support frames of the damaged area. Part of the structure didn’t need to be detached, so it could be used as such in reconstructing the wingtip leading edge. The detached and usable frames were straightened to their original shape. They were fastened with pop rivets to their places, utilizing the intact left-hand wingtip when positioning the support frames.

Blogi_2024-01-08-09.jpg

Blogi_2024-01-10.jpg

After this the back wall and bottom plate of the right-hand wing navigation light bay was constructed with the left-hand wing navigation light bay as a model. The back wall and bottom plate were cut off from 1 mm thick aluminium plate. When the navigation light bay back wall and bottom plate were tentatively in place, the wingtip leading edge was nearing its original shape.

Blogi_2024-01-11.jpg

Blogi_2024-01-12.jpg

An opening was made in the bottom plate of the navigation light for the wiring of the navigation light. Also a cup-like socket was lathed for the later fixing of the light in mind. After that the whole navigation light bay was locked from its edges to the remaining original frames of the wingtip with strips cut from 1 mm thick aluminium plate. The fastening was done with pop rivets.

Blogi_2024-01-13.jpg

Blogi_2024-01-14.jpg

Blogi_2024-01-15.jpg

The next phase was to make a support frame between the edge of the intact area in the wingtip and the back wall of the navigation light, where the original frame had been destroyed. The edge of the intact area is formed by the wingtip’s original curve. However, the curve is somewhat damaged in its upper edge, but repairable and will be hidden by the wingtip new covering.

Blogi_2024-01-16.jpg

The support frame was made of 2 cm wide strips cut off from 1mm thick aluminium plate. To be able to rivet the ends of the support frame strips to the edge of the curve, the original damaged aluminium covering which had been on the frame, was cut off with a Dremel blade. Five strips were fastened between the edge of the curve and the back wall of the navigation light. The fastening was made with pop rivets. To make the structure sturdy enough to bend and fasten the aluminium cover sheets on the frame, two additional crosswise support strips were riveted to the structure. Now we’ll be ready to start covering the right-hand wingtip leading edge with 1 mm thick aluminium sheets.

Photos by Lassi Karivalo.

Translation by Matti Liuskallio.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird, Tuesday Club

Caravelle's Turku team and a nice Christmas lunch

Lauantai 23.12.2023 - Ismo Matinlauri

Suomeksi

On Tuesday, December 19th, the Caravelle Turku restoration group gathered for a Christmas lunch. The place was Krookila Wanha Tupa (Old Farmhouse). The history of the place goes as far back as 1490, and in the summer the farm is open to the public as a museum. We enjoyed a nice and traditional Christmas lunch in this historic and beautiful surrounding.

Blogi_2023-94-01.jpg

Blogi_2023-94-02.jpg

The group picture shows 13 members of the Turku team with Aviation Museum Society Finland chairman Janne Salonen and his mother Liisa Salonen. Liisa has participated in the Caravelle restoration project and has encouraged and cheered up the Turku team on several occasions. Our chief photographer Jouko Tarponen is missing from the picture – he was naturally behind the camera.

Blogi_2023-94-03.jpg

This team will continue its work with the Caravelle after a hopefully short winter break. If we are able to find a suitable warm workshop we will start restoring the passenger seat frames and cabin partition walls while waiting for the weather to get warmer.

Photos by Jouko Tarponen

Translation by Erja Reinikainen

Avainsanat: ilmailuhistoria, entisöinti, Caravelle, OH-LEA, Sinilintu

Santa Claus visited Caravelle

Tiistai 12.12.2023 - Ismo Matinlauri

Suomeksi

On Saturday, December 9th, we had the pleasure to welcome Santa Claus on board our Caravelle. Santa turned out to be a competent pilot and well familiar with the Caravelle’s flight deck equipment. This is understandable – after all, he has hundreds of years’ experience of flying with reindeer.

Cblogi_2023-93-03.jpg

Cblogi_2023-93-12.jpg

The aircraft was open to the public, too. The weather was slightly colder than during the assembly phase in the beginning of June, now it was -5 degrees Centigrade. The rear pantry was in use for the first time, serving visitors glögg and gingerbread and juice boxes to the younger ones.

Cblogi_2023-93-10.jpg

Cblogi_2023-93-06.jpg

During the day we had 63 visitors, including about 15 children. The visitor from farthest away came from Portugal. The visitors were genuinely excited and interested about the airliner and stayed a long time despite the cold weather.

Cblogi_2023-93-05.jpg

Cblogi_2023-93-01.jpg

The hydraulic system of the rear stairway had been repaired a couple of days earlier so we could have the stair open during Santa’s visit. This way the visitors could move flexibly to the aircraft’s tail and behind it, where the Rantala crane truck was parked. The truck interested especially the youngest visitors.

Cblogi_2023-93-09.jpg

Cblogi_2023-93-08.jpg

After the last visitors, we topped up the bags of de-icing salt to make sure the de-humidifying continues inside the aircraft. Santa’s visit was a suitable closing for this eventful year in our Caravelle.

Cblogi_2023-93-04.jpg

Cblogi_2023-93-13.jpg

The Caravelle team wishes our readers Merry Christmas and a Happy New Year!

Photos by Ismo Matinlauri

Translation by Erja Reinikainen

Avainsanat: ilmailuhistoria, entisöinti, Caravelle, OH-LEA, Sinilintu

Caravelle goes into hibernation

Torstai 16.11.2023 - Ismo Matinlauri

Suomeksi

The days are getting shorter and colder even in Turku, on the south-west coast of Finland. The work period for the autumn has ended and it was time to prepare our beauty into hibernation for the winter.

Cblogi_2023-91-01_IM.jpg

Cblogi_2023-91-02_IM.jpg

The last work item for this autumn was to finish the insulation on the cabin walls. On the left-hand side of the cabin wall and ceiling the original insulation material is still there, but on the other side of the cabin the insulation has been dismantled together with the overhead shelves, other interior items, and surface material. We tidied the cut edges of the old insulation material and after analysing different new insulation material alternatives we decided to use cellular rubber, which is available from a hardware store.

It is water repelling, odourless and tasteless, and has a self-adhesive layer on one side. This makes its installation significantly simple and fast. It also acts as a vapour barrier, so no separate plastic barrier is needed, as there is on the inside of the old glass wool insulation layer.

Cblogi_2023-11-14-01.jpgPhoto by Puuilo

An insulation thickness of 10 mm is sufficient for our needs, because the aircraft will not be heated in the winter, nor cooled in the summer. The material is sold in rolls, one metre wide, so it is a material which is easy to cut into suitable pieces.

As the airliner has no heating, a solution for controlling humidity had to be found. We discussed the problem with several experts and decided to try two possible solutions.

Cblogi_2023-91-03_IM.jpg

Ordinary road salt (calcium chloride) was packed into three bags made of fabric, which were hung in the cabin. The salt is a hygroscopic material and absorbs water vapour from the indoor air. Buckets were placed under the bags, and they will be emptied at regular intervals when the salty water drips into them.

Cblogi_2023-91-04_IM.jpg

We are also testing a small air dehumidifier, which recirculates and cools indoor air, condensing humidity from the air. We set the target and limit value to 60% relative humidity. If the indoor humidity is lower, the dehumidifier switches itself off. When the machine is running, its electricity consumption seems to be 2,6 kWh/day when it is running. This means a monthly electricity cost of 20 euros if the dehumidifier is running all the time.

Furthermore, we have blocked all openings and sealed the doors to minimize uncontrolled ventilation and reduce humidity in the cabin. After the first two weeks we can see that in this period the relative humidity of outdoor air at Turku airport has been 85–95 %. In the cabin the readings have been 62–75 % so we are within the set limits. We will follow the readings during the winter and take corrective actions if needed.

The Caravelle has now gone into hibernation, but we will see if it is possible to wake her up for some Christmas events in December.

Photos by Ismo Matinlauri

Translation by Erja Reinikainen

Avainsanat: ilmailuhistoria, entisöinti, Caravelle, OH-LEA, Sinilintu

Gathering information for future cabin restoration work

Lauantai 11.11.2023 - Erja Reinikainen

Suomeksi

The members of the Caravelle technical design team visited Turku a few weeks ago (on October 25th) to find information for the future restoration work in the cabin. The visitors were Markku Ahokoski, Kari Nyman and Martti Saarinen and team assistant Erja Reinikainen.

All summer and autumn access to the Caravelle’s cabin has been through the right-hand side service door and aft stairway. During the assembly phase in June also the emergency exits over the wing were used. The passenger door on the left-hand side is damaged and it can’t be opened. Lately also the aft stairway has been out of use as its hydraulic pump and cylinders are under repair. The service door is smaller than the passenger door and this has caused problems when large items (e.g. plywood boards) have been taken inside for repairs in the cabin. The passenger door needs to be repaired in the spring before any major work in the cabin is started.

Cblogi_2023-10-23-01.jpg

When the passenger door is opened, it moves first straight inwards and then it is manually lifted along its rails up to the cabin ceiling. The door weighs 53 kilos, so opening and closing is assisted with a counterbalancing system. The system consists of roll chains, steel cables and three bungee cords (rubber ropes), several metres long and located in the cargo space under the cabin floor. The mechanism is damaged, and the door can’t be used before the mechanism is repaired. There are no spare parts available so they will have to be made and this makes the repair work a lengthy process.

Cblogi_2023-10-23-02.jpg

During their visit to Turku Markku and Kari opened the cabin floorboards and concentrated on the passenger door’s bungee cord system. They also disassembled the broken roll chains and now their parts can be used as models when making new ones. 

While the others were occupied with the door mechanism, Martti was working on the flight deck installing the latest additions into the instrument panel. The panel on the captain’s side looks quite good already, on the co-pilot’s side there are more still missing. Some instruments have been donated, some have been received in an exchange, some have been bought

Cblogi_2023-10-23-03.jpg

Cblogi_2023-10-23-04.jpg

While the others were working inside the aircraft, Erja dug herself into the storage container to find the cabin seat covers which were brought from Arlanda. According to Murphy’s law, they had been packed into the far corner of the container, in thoroughly sealed boxes which were under other boxes at the very bottom. It turned out that there is a good number of are dark green seat covers in reasonable condition and they can probably be fitted on the seat frames we have. During the winter we can start planning how to clean and repair the seat covers.

Cblogi_2023-10-23-05.jpg

Cblogi_2023-10-23-06.jpg

Winter is coming and there will be a break in the restoration work for the coldest months. Along with that there will also be less blogs during the winter. 

Photos by Erja Reinikainen

Translation by Erja Reinikainen

Avainsanat: ilmailuhistoria, entisöinti, Caravelle, OH-LEA, Sinilintu

How to Fence a Caravelle

Keskiviikko 1.11.2023 - Ismo Matinlauri

Suomeksi

Since the beginning of June, the restored Caravelle has been protected at Turku airport by temporary rented fencing – providing only rather moral security. On Tuesday October 24th the permanent fence around the aircraft was completed. Fortunately during these months before the real fence was built there were no damages or accidents caused by the lack of proper fencing.

Cblogi_2023-90-06_IM.jpg

Photo by Ismo Matinlauri

When the Caravelle’s location was planned in the Turku airport area, it was already obvious that a fence must be built around the aircraft. The main worry were vandals, graffiti sprayers and odd curious visitors. Secondly the fencing helps to control visitors and in other times protects the curious passers-by from accidents in the vicinity of the aircraft.

Naturally the fence will not stop the most persistent trespassers, but it will, however, provide sufficient security.

The purchase of the fence material started already before the Caravelle arrived in Turku. In spring 2022 Aviation Museum Society Finland bought the material for the fence and the gates. First the construction of the fence was scheduled to take place before the aircraft is moved to the site in spring 2023. Soon it was discovered that the fence will hamper the crane operations on site during the assembly and also make the actual assembly work more difficult. Therefore it was decided that the Caravelle is assembled first, and the fence is erected after that.

The construction of the fence was left to a professional – that means that a contractor was hired to erect the fence. For cost saving reasons some of the work was done by the Aviation Museum Society Finland volunteers. In this case this meant assisting in setting the fence poles into concrete and in spreading the net wiring between the poles. This reduced the total cost nicely.

Building the fence was an efficient procedure, completed in five workdays:

• Day 1: marking and levelling the fence line, digging the holes for the concrete foundations,
• Day 2: setting the posts into concrete, 50 – 200 litres of concrete was poured into each hole,
• Day 3: drilling the bases for the fence posts on the rock slope behind the aircraft and landscaping the concrete foundations,
• Day 4: fastening the wire net on the gate halves (two 5 m wide gates) and making preparations for fastening the wire net,
• Day 5: unrolling the wire net and fastening on the posts, installing the gates and checking their operation.

Cblogi_2023-90-01_JS.jpg

Photo by Janne Salonen

Cblogi_2023-90-02_JS.jpg

Photo by Janne Salonen

Cblogi_2023-90-03_IM.jpg

Photo by Ismo Matinlauri

Cblogi_2023-90-04_JT.jpg

Photo by Jouko Tarponen

Cblogi_2023-90-05_JT.jpg

Photo by Jouko Tarponen

Building the fence in late October was eventually a good thing. The weather is getting cold and there is quite a limited amount of work which can be done inside and outside the Caravelle due to the cold and wet weather, so we had plenty of time to assist in erecting the fence.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

The Finnish DC-Association's DC-3 visited Turku

Sunnuntai 8.10.2023 - Ismo Matinlauri

Suomeksi

On Wednesday, October 4th, the Caravelle restoration work was interrupted in a very positive way: The DC-Association’s Douglas DC-3 OH-LCH landed in Turku and taxied to the airport terminal.

Cblogi_2023-88-01.jpg

We can say that “the flying eternally youthful visited the new senior”. The DC-3 was in Turku on a training flight and the crew came to see how the Caravelle’s restoration work is progressing.

Cblogi_2023-88-02.jpg

The crew members who visited the Caravelle: pilot Mikka Rautakoura, maintenance director Jussi Pakarinen, mechanic Reino Ahola and chief pilot Petri Munukka.

There was a lively conversation in the cabin and on the flight deck about the technology used in the Caravelle. The visitors were particularly interested in how the acquisition of the flight instruments for the instrument panel is progressing.

Cblogi_2023-88-03.jpg

Cblogi_2023-88-04.jpg

Photos by Ismo Matinlauri

A brief update on the restoration work: This week we installed the last new plywood boards into the floor and now the necessary areas have been replaced. Four boards of 12 mm thick waterproof plywood were needed, but now the critical areas of the floor are in good condition.

Cblogi_2023-88-05.jpg

Cblogi_2023-88-06.jpg

Cblogi_2023-88-07.jpg

We installed a sheet of thick plexiglass in the cabin floor area above the wing-fuselage joint. In the future the visitors are able to see the details of the wing-fuselage joint.

Outside the aircraft the polishing work on the fuselage has also progressed. The polishing of the front section will be completed before the autumn rain and cold weather settle in. During the following two weeks a permanent fence will be built around the aircraft. That will be the topic in the blog at the end of this month.

Photos by Jouko Tarponen except if otherwise mentioned.

Translation by Erja Reinikainen. 

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Caravelle's autumn season started in the beginning of September

Keskiviikko 6.9.2023 - Ismo Matinlauri

Suomeksi

The restoration work of the Caravelle OH-LEA at Turku airport started efficiently on Monday, September 4th, when there were nine volunteers at work. In the Turku area it rained a lot in August, and it wasn’t possible to do any of the remaining restoration work outside the aircraft. During the summer weekends the Caravelle was open to visitors, and this led to some restrictions to starting the work inside the aircraft.

Cblogi_2023-82-00.jpg

On the last weekend we had the summer season’s last open doors event and after this it was possible to continue the restoration work from where we had left it in June. The half cloudy weather was ideal for sanding, polishing, and painting the last identification markings.

Cblogi_2023-82-03-04.jpg

Cblogi_2023-82-05-06.jpg

Cblogi_2023-82-07-08.jpg

On the underside of the fuselage there is a small area which needs to be sanded and painted with aluminium colour paint. The last identification markings will be painted on the wings and fuselage. The largest of these is the registration OH-LEA missing on the underside of the wing.

Cblogi_2023-82-01-02.jpg

Photos by Lassi Karivalo.

A lot of polishing work is still needed, this is the main item to be completed on the outer surface. Polishing will be continued as long as the weather allows. However, there is so much to be polished that the work will continue next spring.

Cblogi_2023-82-09.jpg

The work inside the aircraft has also started. The repairs and painting of the flight deck and the toilet area will be the first work items. The floor and the ceiling area in the cabin will follow in the coming weeks.

Cblogi_2023-82-10.jpg

It was a pleasure to have visitors from the Tuesday Club at Vantaa. Three club members came to Turku to measure the openings on the tail of the DO-5, which is temporarily parked next to the Caravelle. Protecting covers will be made at the Tuesday Club to cover the holes before the autumn storms arrive.

Cblogi_2023-82-11.jpg

The busy afternoon was spent at work, but there was a moment for lively discussion when the Turku team and the Tuesday Club members had a coffee break together inside the aircraft at “Café Caravelle”. The Tuesday Club is a valuable support and aid for the Turku team when the details of the restoration work are pondered. We are looking forward to making good progress during the autumn.

Photos by Jouko Tarponen except if otherwise mentioned.

Translation by Erja Reinikainen.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird, Tuesday Club

Caravelle visitors are welcome

Tiistai 4.7.2023 - Ismo Matinlauri

Suomeksi

The Caravelle restoration team went on a well-earned summer holiday after the Turku Airshow. The restoration work is not finished outside or inside, and the team will continue its work in August. However, the unfinished appearance isn’t an obstacle for presenting the aircraft to the interested audience. The nearly 1300 visitors during the Airshow days proved this to be true.

Blogi_2023-72-01.jpg

Last week I had the pleasure of presenting the Caravelle to a group of motor bikers consisting of Hornet-men mainly from the Defence Forces, Insta, Finnair and Patria. This was a group of experts and the first hour or so was spent outside the aircraft discussing the wing construction and engines. The Caravelle’s history and similarities to the Comet, especially in the flight deck, were discussed, too.

Blogi_2023-72-02.jpg

The visit to the cabin and flight deck was brief, mainly due to the temperature resembling a sauna. There the visitors concentrated on the differences in the passenger cabins of modern and 1960s aircraft. The seat frames in the rear cabin caught the visitors’ attention as they are not from a Caravelle III.

Blogi_2023-72-03-04.jpg

I thank the visitors for their interest in our project – and take the opportunity to welcome more visitors to come and see the Caravelle. English-speaking vistors are welcome, too! At the moment we don’t have regular visiting times, but we try to be flexible in arranging someone to come and give a tour. Feel free to contact me about a visit, preferably well in advance, so that we can arrange a tour for you.

Contact berfore visiting: Ismo Matinlauri, +358405013495, matinlaurii(at)gmail.com

Photos by Ismo Matinlauri.

Translation by Erja Reinikainen.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Thank you to the supporters of the Caravelle project

Keskiviikko 21.6.2023 - Erja Reinikainen

We managed to restore the SAS Caravelle III Sven Viking, abandoned on the edge of the airfield for decades, to the Finnair OH-LEA Bluebird in the schedule we had defined. It was open to the public during the Turku Airshow at Turku airport, on June 17th and 18th. On both days there was a queue at the Bluebird’s gate and the volunteer guides, who have been involved in the restoration work, had an interested audience. After a successful effort – the restoration and the airshow weekend – the team of volunteers can relax and enjoy a well-earned summer holiday.

Cblogi_2023-70-01_JT.jpg

Cblogi_2023-70-02_JT.jpg

Photos by Jouko Tarponen

We think that this is a good moment to thank all those who have supported the Caravelle project. Without you the Bluebird wouldn’t be ready to be presented to the public.

In this period of about a year and a half we have received financial support for the procurement of many important items. In a society operating on membership fees we appreciate your support very much. Many of you have lent us special tools which are needed in the disassembly and reassembly work. Without your help we wouldn’t have been able to get these tools. Furthermore, we have been given access to Caravelle archive data, we have been given lots of valuable advice and all kinds of help in the problems we have encountered during the project.  

We thank the companies and societies which have supported us. They are mentioned at the end of this blog.

We thank all the private persons who have helped us in various ways during the project.

And last but not least, we thank the family members and other close ones of our volunteers for patience and understanding for the OH-LEA Bluebird.

Caravelle-project supporters:

Statens Maritima on Transporthistoriska Museer (Sweden)

  • Sud Aviation SE 210 Caravelle III SE-DAF "Sven Viking" aircraft.

Arlanda Flygsamlingar (Sweden) / Jan Forsgren

  • Assistance in matters related to Caravelle aircraft.

Le Caravelle Club (Sweden) / Ulf Nyström

  • Assistance in matters related to disassembling and reassembling the Caravelle, and tools lent for assembly work.  

Swedavia (Sweden) / Andreas Persson

  • Assistance in matters related to moving and disassembling the Caravelle.

Danmarks Tekniske Museet, Helsingør (Denmark) / Susanne Krogh Jensen

  • Assistance and archive material in matters related to disassembling and reassembling the Caravelle,.

Ahola Special

  • Assistance and consulting in planning the Caravelle transportation.
  • Special thanks to the drivers for helping in loading and unloading the aircraft parts.

Finnlines

  • Trasportation of four special trucks on the ferry from Kapellskär to Naantali and turning the ferry around in Naantali.

Rantala-yhtiöt

  • Assistance and consulting in planning the lifting operations during the assembly phase.
  • Special thanks to the crane operators during the assembly.

P. Tyllilä Linja Oy / Juhani Tyllilä, Katri Tyllilä, Kimmo Koskinen

  • Travel and accommodation arrangements in Finland and abroad.

Select Service Partner Finland Oy

  • Lunches at Turku airport for the volunteers working on the Caravelle site.

Kuljetus R. Stenvall Oy / Jussi Mäkelä

  • Sea container logistics and support in planning the transportation, contact information for Finland and Sweden.

Nostot & kuljetukset R. M. Laine Oy / Mikko Laine

  • Transportation and lifting of sea containers, passenger stairs, etc. in Turku area.

Toolpoint

  • Hydraulic pump and cylinder for the disassembly and reassembly work.

Hyvinkään Ilmailukerho ry

  • Cradles and supporters lent for the disassembly and reassembly.

Finnair Tekniikka

  • Tools lent for disassembly and reassembly.

Granlund

  • Work safety material for the disassembly team.

Finavia / Juha Aaltonen, Veli-Matti Paasikivi, EFTU kunnossapito

  • The site for the Caravelle at Turku airport and other assistance in the project.
  • Earth moving works on the Caravelle site and wheel loader to help during the preparations of the assembly phase.

Canon

  • Colour prints of the OH-LEA painting by Kari Vertanen for a fund-raising campaign.

Port of Turku

  • Assistance in bringing the Caravelle to be restored in the Pansio port hall.

RMR Merirakenne

  • Assistance and material for building the free-turning pulley system for rotating the aircraft.

Companies in the Pansio shipyard area

  • Assistance in moving and lifting the aircraft and tools lent for the assembly work.

Teknos / Markku Uusitalo

  • Paint for the restoration work.

Anzo / Oy C.E. Lindgren Ab

  • Paint brushes for the restoration work.

Jalmeri

  • Mohair paint rolls for the restoration work.

Arctic Decals / Mika Jernfors

  • Assistance in acquiring the stencil stickers and in sorting out the details for the painting work.

Peter Lampinen

  • 3D-printing of the navigation light covers

Ronema

  • Instruments for the Caravelle’s flight deck.

Consolis Parma

  • Three hollow core slabs to be placed under the Caravelle’s landing gear at Turku airport.

NCC

  • Gravel for building the other driveway to the Caravelle site.

Ossi Harjula

  • Construction contracting services for the Caravelle site works.

Finnish Aviation Museum

  • Support in acquiring information, permission to use premises and equipment for doing Caravelle restoration work, tools lent for disassembly and reassembly.

The Media

  • Articles and video material about the project in various phases.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Turku Airshow - Caravelle flight to Las Palmas

Maanantai 19.6.2023 - Erja Reinikainen

During the weekend, June 17th and 18th, Turku airport was the venue for the Turku Airshow 2023, which was the main airshow of the year in Finland. Early this year this date was written in large numbers on the coffee room wall in the hall in Pansio, where the Caravelle was under restoration. The aim was to present the Caravelle to the public, outside and inside, and tell its story until this day.

Cblogi_2023-70-01_JT.jpg

The Caravelle was outside the actual display area and because of this only those who came to the airshow by bus from Turku could visit the aircraft. On the other hand, the location by the pedestrian route allowed quick and easy access to the aircraft.

Cblogi_2023-70-02_JT.jpg

Cblogi_2023-70-02a_JT.jpg

Cblogi_2023-70-02b_JT.jpg

There were more visitors than we expected. On Saturday there were 865 and on Sunday 430 visitors, in total 1 295. At times the passenger stairs were crowded but some queuing didn’t seem to bother the good-humoured visitors. They told the Caravelle guides many stories about the aircraft. Sometimes it even seemed that the roles were interchanged. The visitor number 1000 was rewarded with a Caravelle key fob. Danial was the lucky winner who was congratulated by Jari Myrsky and received the key fob.

Cblogi_2023-70-03-04_IM.jpg

Photos by Ismo Matinlauri

Another visitor must be mentioned. The WWII fighter veteran and Caravelle pilot Mauri Maunula stopped by to have a look at the replica of his previous aircraft. During his brief chat with the Aviation Museum Society Finland’s chairman Janne Salonen several colourful incidents from Mr Maunula’s Caravelle times were told.

Cblogi_2023-70-03-05_JT.jpg

There was a small but busy Aviation Museum Society Finland sales stall by the Caravelle. Caravelle caps, T-shirts and mugs were sold there. On the second day of the airshow old aviation magazines were handed out for free to those coming to see the Caravelle. The magazines were popular especially among the younger visitors.

Photos by Jouko Tarponen except if otherwise mentioned.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Busy day at Turku Airport

Torstai 8.6.2023 - Erja Reinikainen

Suomeksi

On Wednesday, June 7th, there were about a dozen volunteers at work to prepare “the Bluebird” for public display. The work started at about 10 am and was continued until 6 pm. Now the weather was nicer than last week, the sun was shining, and it was almost warm.

Blogi_2023-65-01_IM.jpg

Photo by Ismo Matinlauri

Blogi_2023-65-02_JT.jpg

Blogi_2023-65-03_JT.jpg

Photos by Jouko Tarponen

The aim is to take down the scaffolding before the end of this week, so the work in the tail has been prioritized. The stencil stickers for painting the “AERO” text on the fuselage below the horizontal stabilizer were fastened into place and the text was painted in blue. In the tail fin there are several fillets and panels and the last of them were fastened into place. When the others were leaving, two men remained on the scaffolding finishing the panel sealings.

Blogi_2023-65-04_JT.jpg

Blogi_2023-65-05_JT.jpg

Photos by Jouko Tarponen

Blogi_2023-65-06_ER.jpg

Photo by Erja Reinikainen

There was activity on ground level as well. The right-hand side main landing gear was being cleaned. The result was surprisingly good although there was no water available. Under the aircraft the panels under the wing to fuselage joint were installed into place. Polishing was under way, too, on the wings and in the nose section. Furthermore, the blue paint on the window line had been slightly damaged by the crane slings when the fuselage was lifted. The damaged areas were sanded and re-painted.

Blogi_2023-65-07_ER.jpg

Photo by Erja Reinikainen

Blogi_2023-65-08_JT.jpg

Photo by Jouko Tarponen

Blogi_2023-65-09_ER.jpg

Photo by Erja Reinikainen

The cleaning of the cabin, started the day before, was continued. Now the cabin, flight deck, toilets, and aft upper cargo department have been vacuumed and cleared. The wall panels and overhead shelves have also been wiped with a damp cloth. This was a quick tidying of the appearance so that the inside of the aircraft can be presented to the public on the Turku airshow days. The restoration of the interior will be a project for the future.

Blogi_2023-65-10_CO.jpg

Photo by Curt Oksa

There were several visitors during the day. Maybe the Caravelle article on Helsingin Sanomat website today and the beautiful weather encouraged people to come and see “the Bluebird”. There were also visitors from Turku customs office, four officials and a dog. No traces of old smuggled goods were detected.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

The "Bluebird" assembly team

Lauantai 3.6.2023 - Erja Reinikainen

Suomeksi

The blogs written this week mention several times the Caravelle assembly team. So it is more than appropriate to introduce this group which was working on the Caravelle at Turku airport on two occasions in the past weeks. The first work phase took place on May 22nd-23rd, when the wings were transported from Pansio and joined at the airport. The second work phase was longer, May 29th-June 2nd, when first the fuselage was assembled on the wing and then the horizontal stabilizer and the vertical stabilizer were assembled on the tail. When written like this the task may sound simple, but it was far from that.

During the winter the Caravelle technical team, consisting of Markku Ahokoski, Kari Nyman, Martti Saarinen and Ismo Matinlauri, was coordinating the Caravelle restoration work which was going on in Pansio. Last year Markku, Kari and Martti planned how the Caravelle can be disassembled and now they planned and scheduled how it can be put back together.

Lifting the parts of the aircraft from a trailer and getting them accurately into place in the strong wind was a challenging task. Fastening the fuselage-wing joint bolts in the cramped keel tunnel wasn’t easy as it was almost dark there. Getting the vertical stabilizer and rudder into place on the scaffolding, in the torrents of rain, was quite an achievement, too. Assembling all the wing root fairings required a lot of patience from the team, as there were dozens of panels and hundreds of rivets. In addition to the demanding assembly work there were plenty of other activities during the week: jacks, plywood boards, pallets and car tires were moved where needed, items were taken out from the sea container and put back, slings and cargo straps were used for multiple purposes, there were several visits to the hardware store, etc.

The assembly team was led by Markku Ahokoski and in addition to Kari Nyman and Martti Saarinen, there were Reima Lindroth, Hannu Penttilä and Jouko Rinne, who had also been in Arlanda during the disassembly. Martti Saarinen wasn’t in Turku, but he participated in discussions on the phone during the assembly week. Yrjö Honkavaara and Elias Viitanen from the Pansio group were assisting in the assembly work and Erja Reinikainen worked as an overall helper.

This team of eight volunteers assembled the Caravelle “Bluebird” in five days, not including the days when the parts were lifted on trailers. Now the Pansio team can continue and assemble the remaining fairings and panels and go on with the sanding, painting, and polishing work.

Cblogi_2023-57-09_JT.jpg

Photo by Jouko Tarponen on May 29th, 2023.

This photo of the assembly team was taken in the Pansio hall on May 29th when the Caravelle fuselage had been lifted on the Ahola Special Transport trailer and the Society’s banner had been straightened. From the left: Hannu Penttilä, Yrjö Honkavaara, Reima Lindroth, Markku Ahokoski, Ismo Matinlauri, Elias Viitanen, Erja Reinikainen and Jouko Rinne, on far right ”Curre” who came to see what is going on in the hall.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

The "Bluebird" has been assembled

Perjantai 2.6.2023 - Erja Reinikainen

Suomeksi

On Friday, June 2nd, the Caravelle assembly team and the assistants who came to help from Pansio were facing the dreariest conditions of the week at the Turku airport: it was +6°C in the morning, there was a strong wind from the north and there were heavy showers of rain during the day.

Cblogi_2023-62-08_JP.jpg

Photo ny Janne Pauni

Cblogi_2023-62-09_ER.jpg

Photo by Erja Reinikainen

In the morning the scaffolding builders extended the scaffolding around the tail. The rudder was unloaded from the sea container and pieces of metal net were fastened on the holes in the leading edge of the rudder to prevent birds from getting inside the rudder. A new cable was installed for the anti-collision light – it will wait for the new electrical system to be installed later. The rudder and the elevators were locked into a fixed position by preventing the movement of their servos.

Cblogi_2023-62-10_ER.jpg

Cblogi_2023-62-11_ER.jpg

Cblogi_2023-62-12_ER.jpg

Photos by Erja Reinikainen

The assembly team prepared to assemble the vertical stabilizer and the rudder in the usual way: the tools and accessories, bolts, safety harnesses, cargo straps, etc. were arranged for use. First the vertical stabilizer was lifted from the ground, a rather challenging operation in the strong wind. High on the scaffolding around the tail the tall stabilizer was inched into place although a shower of rain disturbed the assembly team. The main bolts could be installed quite easily. The rudder is a difficult item to lift, tall and narrow, and it had to be fitted accurately into place in the strong wind. The cargo straps held by the assistants prevented the rudder from swinging during the lifting and assembly. This time it took more effort to install the fasteners – and another heavy shower disturbed the team on the scaffolding. By lunchtime the rudder was in place and the Finnish flag was up on the Caravelle’s tail – a fine sight. It was time to call the aircraft by its Finnish name, “Sinilintu”, i.e. “Bluebird”.  

Cblogi_2023-62-13_ER.jpg

Photo by Erja Reinikainen

Cblogi_2023-62-14_JS.jpg

Photo by Janne Salonen

Cblogi_2023-62-15_ER.jpg

Photo by Erja Reinikainen

The Friday afternoon was spent on miscellaneous tasks. The installation of the stabilizers was finalized on the scaffolding, the floor in the cabin was temporarily fixed with plywood boards, the car tires, and pieces of cardboard on which the stabilizer and rudder had been on the ground were collected, the cargo straps were picked up, the contents of the containers was arranged, etc. The repaired and painted radome was installed on the Caravelle’s nose, and this changed its appearance remarkably.

Cblogi_2023-62-16_JS.jpg

Photo by Janne Salonen

During the day an electric cable was pulled from the Finavia area to the right-hand side of the nose wheel. Hopefully the installation will be ready next week, and power will be available on the site. This would make it possible to start sanding, polishing and installation work.

Cblogi_2023-62-17_JT.jpg

Photo by Jouko Tarponen

The assembly team (Markku, Kari, Hannu, Jouko, Reima and Erja) were relieved, they had completed this phase in the Caravelle’s restoration successfully and in the planned schedule. Now the Turku (former Pansio) team can continue and finalize the outside of the aircraft and prepare the cabin for display during the following weeks before the Turku Airshow. The daily reporting of the assembly work ends to this blog.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Assembly of the horizontal stabilizer and farewell to the hall in Pansio

Torstai 1.6.2023 - Erja Reinikainen

Suomeksi

On Thursday, June 1st, the Caravelle’s horizontal stabilizer and vertical stabilizer were lifted on the Ahola Special Transport trailer, and these were the last items to be transported as special transport. This load was not tall and not very wide either, so it could be taken to the airport during the day. The last items were packed into the sea container and the Pansio hall was ready to be vacated.

Cblogi_2023-62-01_JT.jpg

Cblogi_2023-62-02_JT.jpg

Photos by Jouko Tarponen

Cblogi_2023-62-03_JS.jpg

Photo by Janne Salonen

At the airport the assembly work was continued in windy weather. In the morning preparations were made for assembling the horizontal stabilizer and the assembly team checked that all needed special bolts, tools, safety harnesses, etc. were at hand. The “hiab” loader crane arrived soon after noon. When everything was ready for the lift, the wind got stronger, there was a brief hailstorm and sand dust was flying in the air.

Cblogi_2023-62-04_JT.jpg

Photo by Jouko Tarponen

First the vertical stabilizer was lifted from the trailer and lowered to the ground on car tires to wait for assembly on the following day. The rudder was brought to the airport from Pansio in the afternoon, in the sea container which had been loaded there in the morning.

Cblogi_2023-62-05_ER.jpg

Photo by Erja Reinikainen

The Caravelle’s horizontal stabilizer is large and lifting it in the gusty wind on the fin root on top of the fuselage was quite an achievement. Fortunately the wind was blowing against the nose of the aircraft and towards the tail, so the stabilizer didn’t swing too much from side to side during the lift and assembly. Cargo straps had been fastened to the tips of the stabilizer and the assembly team members holding the straps were prepared to prevent the swinging. Once again there were professionals at work – assembling the stabilizer on the scaffolding and operating the crane – and the stabilizer was soon in place without too much effort. The main bolts could be fastened without major difficulties and the assembly team could sigh with relief. Then it was time for a coffee: the aggregate was started, coffee was brewed, and the team sat beside the sea container, in shelter from the wind.

Cblogi_2023-62-06_JT.jpg

Cblogi_2023-62-07_JT.jpg

Photos by Jouko Tarponen

Cblogi_2023-62-08_JP.jpg

Photo by Janne Pauni

There were other activities during the day too: more wing to fuselage fillets were assembled and fastened using rivets and screws. The pop rivet guns were causing some trouble again, the battery driven one didn’t function well and the manual one broke the day before. The large rivets are so thick that the tools are strained to the limit. There was also activity in the cabin, after a long silence, when the wall upholstery was tidied, and the toilets were fixed. The plywood floorboards will have to be repaired before the public can be allowed to come and see the cockpit and cabin.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Work on the nosewheel and wing fillets

Keskiviikko 31.5.2023 - Erja Reinikainen

Suomeksi

On Wednesday, May 31st, the Caravelle assembly team worked at Turku airport in windy weather, concentrating on smaller and less impressive, but nevertheless important details.

Cblogi_2023-61-01_ER.jpg

Cblogi_2023-61-02_ER.jpg

Photos by Erja Reinikainen

The assembly of the wing to fuselage fillets was continued. In the wing root there are several fillets, of different shapes and sizes, fastened with rivets and screws. The assembly team spent all day fitting these fillets into place, on top of the wing and below it. Fasteners, which had been drilled out in Arlanda had to be removed, holes were opened, and countersunk edges drilled. New fasteners were installed, screws with cup washers and pop rivets. Probably hundreds of pop rivets were used during the day. Unfortunately the bottleneck in the assembly work was that there was only one battery-driven pop rivet gun in use.

Cblogi_2023-61-03_ER.jpg

Photo by Erja Reinikainen

The nose landing gear has been retracted since Arlanda as the fuselage has been on supporters on the floor. Now an external hydraulic pump was connected to the actuating cylinder of the nose landing gear and using the emergency manual unlock mechanism the landing gear was extended. The nose was lifted a little with the jacks under the front fuselage and now the aircraft looks as if it is positioned on the nose wheels, although its weight is still on the jacks. In the future a support will be made for the nose landing gear to take the weight off the wheels.

Cblogi_2023-61-04_ER.jpg

Photo by Erja Reinikainen

During the day scaffolding was built around the tail for the assembly of the stabilizers. On Thursday, June 1st, the horizontal and vertical stabilizers will be transported from Pansio to the airport. The aim is to lift the horizontal stabilizer from the trailer on the Caravelle’s tail. It remains to be seen whether this is possible or not if the wind is as strong as it was today.

Cblogi_2023-61-05_JT.jpg

Cblogi_2023-61-06_JT.jpg

Cblogi_2023-61-07_JT.jpg

Photos by Jouko Tarponen

While the riveting of the wing fillets was going on at the airport, the Pansio hall was cleared. The hall contract ends on June 1st and all the parts, tools and accessories which are still there will be brought to the airport in a sea container. In the coming weeks the Pansio team will go on with the remaining painting and polishing work at the airport.

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking;OH-LEA, Sinilintu, Bluebird

The fuselage is installed on the wing

Tiistai 30.5.2023 - Erja Reinikainen

Suomeksi

The Caravelle’s fuselage was transported from Pansio to Turku airport during the night, May 29th-30th. The load on the trailer was so tall that the Ahola truck had to do quite a detour to get to the airport. On Tuesday morning the Caravelle trailer was waiting for the assembly team to arrive.

Cblogi_2023-58-01_JT.jpg

Cblogi_2023-58-02_JT.jpg

Photos by Jouko Tarponen

Cblogi_2023-58-03_JS.jpg

Photo by Janne Salonen

In the morning there was a mobile crane with two hooks and a “hiab” loader crane, on which the free-turning cable pulley system was fastened. This made it possible to lift the fuselage and to turn it around all its axes. First the fuselage was lifted from the trailer and supported by the cranes. The assembly team placed groups of three jacks on plywood boards under the fuselage, one group in front and another in the rear. Then the fuselage was lowered slowly into its position on the wing.

Cblogi_2023-58-04_ER.jpg

Cblogi_2023-58-05_ER.jpg

Photos by Erja Reinikainen

The fuselage was carefully manoeuvred downwards, inch by inch, guiding it to meet the assembly points on the wing and the front and rear edges of the wing joint. The final inches required accuracy from the crane operators when the fuselage had to be turned towards the road or towards the forest, the nose or the tail had to be lowered or the whole fuselage rolled slightly. Fortunately there were calm professionals on the crane controls as well as in the assembly team and eventually the fuselage settled into place. This phase took about one hour.

Cblogi_2023-58-06_ER.jpg

Cblogi_2023-58-07_ER.jpg

Photos by Erja Reinikainen

Getting the bolts connecting the wing and the fuselage into place took more time. The fuselage was still supported by the crane slings when the position of the fuselage was manoeuvred so that the bolts could be fastened. The first fasteners were easy to get into place but the attachment bolts in the fuselage keel tunnel area and especially the front lower fittings were the most difficult to install. To get the bolts into place the position of the aircraft was inched by using the tripod jacks, changing the position of the wings, and trying to get weight into the tail. A couple of times all members of the assembly team climbed into the tail section as weight load. By lunchtime all bolts had been installed.

Cblogi_2023-58-08_ER.jpg

Cblogi_2023-58-09_ER.jpg

Photos by Erja Reinikainen

In the afternoon a large tripod jack was brought under the tail to support it, assembly work in the keel tunnel was continued, and the assembly of the wing leading edges and the wing to fuselage fillets was started. During the disassembly in Arlanda the leading edge, flaps and wing root fillets of the left-hand wing had been removed – and now they will be installed back into place. A lot of fasteners will be needed, and there will be demand for the fasteners which were cleaned in the ultrasonic washer in Pansio. A leak was observed in the hydraulic system of the integral stairway, now it was repaired, and the stairway is operating again.

Cblogi_2023-58-10_ER.jpg

Photo by Erja Reinikainen

Members of the Pansio team and of the airport staff came to see the Caravelle and to take pictures. There were also curious visitors who had read about the aircraft in the local paper, Turun Sanomat. There will be more to see on Thursday when the vertical stabilizer is lifted into place.

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking;OH-LEA, Sinilintu, Bluebird

The Caravelle left Pansio

Maanantai 29.5.2023 klo 22.20 - Erja Reinikainen

Suomeksi

On Monday, May 29th, the Pansio team was finishing the last tasks on the Caravelle’s fuselage as the loading on the Ahola Special Transport trailer had been scheduled for the afternoon. And naturally there was the final rush: the last layer of lacquer was spread on the blue strip on the window line around noon. A padlock was installed on the service door. The stencil sticker for painting OH-LEA registration on the right-hand side of the fuselage was fitted into place.

Cblogi_2023-57-01_JT.jpg

Photo by Jouko Tarponen

Cblogi_2023-57-02_JS.jpg

Cblogi_2023-57-02a_JS.jpg

Cblogi_2023-57-02b_JS.jpg

Photos by Janne Salonen

The assembly team had arrived, and they were helping to install nets into the openings in the rear fuselage and vertical stabilizer so that birds wouldn’t nest inside the aircraft’s structures. In Arlanda there had been a whole colony of bird’s nests in the openings. Two large Aviation Museum Society Finland banners were fastened on the fuselage for the duration of the transport. This was a task easier said than done!

Cblogi_2023-57-03_JT.jpg

Cblogi_2023-57-04_JT.jpg

Photos by Jouko Tarponen

The fuselage was lifted from its supports using the bridge cranes in the hall. Then the Ahola trailer was reversed under the fuselage and the fuselage was lowered on its supports. Everything went well – and no wonder, this had already been done in Arlanda in August last year. Many thanks to the Ahola professionals for good work and co-operation!

Cblogi_2023-57-05_JT.jpg

Cblogi_2023-57-06_JT.jpg

Photos by Jouko Tarponen

An unpredictable setback occurred when the pallet with the free-turning cable pulley system was loaded on the trailer.  The cable pulley system is needed when the fuselage is lifted from the trailer and on the wing at the airport and it will be necessary to turn the fuselage around its longitudinal axis. The pallet had already been lifted from the floor, using the bridge crane, when the crane suddenly stopped and wouldn’t move. Fortunately a fork-lift from the shipyard happened to drive by at that moment and the driver kindly helped in lifting the pallet with the pulley system on the Ahola trailer. The Caravelle was ready to be pulled out from the hall.

Cblogi_2023-57-07_JT.jpg

Cblogi_2023-57-08_JT.jpg

Cblogi_2023-57-09_JT.jpg

Photos by Jouko Tarponen

Cblogi_2023-57-10_JS.jpg

Photo by Janne Salonen

Now the Pansio port hall is almost empty. Only the stabilizers, two passenger stairs and the storage container remained there. The fuselage will be transported to the Turku airport during the night and on Tuesday morning, May 30th, it will be lifted on the wing. The remaining parts and the sea container will be transported to the airport on June 1st.

Avainsanat: ilmailuhistoria, entisöinti, Caravelle, SE-DAF, Sven Viking, OH-LEA, Sinilintu

Last-minute rush in Pansio

Maanantai 29.5.2023 klo 22.00 - Erja Reinikainen

Suomeksi

The transportation of the Caravelle’s fuselage is approaching and the Pansio team members have been busy all weekend, completing the last tasks on the fuselage. The fuselage will be lifted on a trailer on Monday evening, May 29th, and transported to the airport during the night.

Cblogi_2023-41-03_ER.jpg

Photo by Erja Reinikainen

The last tasks included the stencil stickers, which were fastened on the fuselage for painting the texts and logos according to the Finnair paint scheme. The stencils came from the print cut into individual text sheets and the largest Finnair texts divided into several parts. The letters and logos which will be painted were picked away from the sheets – i.e. there are holes in the areas which are painted. When this had been done, an adhesive foil was placed on the stickers to hold the letters in shape when the stickers are fastened on the aircraft. The stickers used as stencils are placed carefully on the fuselage and the texts, logos and registration are painted with a roller, following the holes in the stencils. When the paint has dried, the stencils are removed.

Cblogi_2023-54-02.jpg

Cblogi_2023-54-03.jpg

Cblogi_2023-54-04.jpg

Photos by Ismo Matinlauri

The stencil stickers for painting Finnair and OH-LEA, which are the largest and most difficult stickers to handle, were fastened on both sides of the fuselage on Friday, May 26th. The stencils stayed well in place when the adhesive foil was removed, and the texts have been painted. Some of the stencils have already been removed, some of the texts are still drying.

Cblogi_2023-54-05_JT.jpg

Photo by Jouko Tarponen

During the weekend the blue stripe on the window line was painted once more. The blue paint is drying and the preparations for transporting the fuselage are on the way.  

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking, OH-LEA, Sinilintu, Bluebird

« Uudemmat kirjoituksetVanhemmat kirjoitukset »